X
Visit Full Site

Ridgewood Work Will Create Notable Traffic Delays

Sonora, CA — TUD crews will be working to install a new water transmission line in the area of Ridgewood Drive over the next month.

Work is scheduled to begin today (April 7) and continue through May 5. During this time there will be periodic lane and full road closures on, and around, Ridgewood Drive. Travelers are advised to take alternate routes if possible and be prepared for up to 15 minute delays. The work hours are 8:30am-3:30pm.

The District reports that once completed, “The Ridgewood Water Transmission Line Improvement Project will consolidate the Scenic View Water Treatment Plant with the Phoenix Lake Water Treatment plant, allowing the district to eliminate two water tanks that are in poor and failing condition, consolidate two water treatment plants and four pump stations providing significant savings in operation costs.”

This post was last modified on 04/07/2023 5:53 am

Written by BJ Hansen.

Sign up for our Breaking News Alerts and the myMotherLode.com Daily Newsletters by clicking here. Report breaking news, traffic or weather to our News Hotline (209) 532-6397. Send Mother Lode News Story photos to news@clarkebroadcasting.com.

For Caltrans traffic information for Highway’s 4, 49, 59, 108, and 120 plus a view of traffic on other Mother Lode roads click on “Traffic” or keyword: traffic and our local gas price page is here. For an overview of extreme weather news stories go here.

Tags: Traffic