X
Visit Full Site

Mother Lode Road Work

Angels Camp, CA– Crews from Caltrans will be maintaining Mother Lode roadways this week.


In Calaveras County core drilling will be completed on Highway 49.  Work will begin at the Vista Point at New Melones Reservoir and end at San Antonio Creek,  One-way traffic control will be conducted and 10 minute delays are expected.  Also on Highway 49, crews will be brush cutting from Gold Strike Road to Stockton Hill Road. Motorists should expect 10 minute delays and one-way traffic control operations.


In Tuolumne County crews will be on Highway 108 from the end of the Woods Creek Bridge to Camp Blue Road.  Core drilling will be completed. One-way traffic control will also be in effect and 10 minute delays are expected.

This post was last modified on 11/12/2011 3:33 pm

Angels Camp, CA– Crews from Caltrans will be maintaining Mother Lode roadways this week.


In Calaveras County core drilling will be completed on Highway 49.  Work will begin at the Vista Point at New Melones Reservoir and end at San Antonio Creek,  One-way traffic control will be conducted and 10 minute delays are expected.  Also on Highway 49, crews will be brush cutting from Gold Strike Road to Stockton Hill Road. Motorists should expect 10 minute delays and one-way traffic control operations.


In Tuolumne County crews will be on Highway 108 from the end of the Woods Creek Bridge to Camp Blue Road.  Core drilling will be completed. One-way traffic control will also be in effect and 10 minute delays are expected.

Written by Tracey Petersen.

Sign up for our Breaking News Alerts and the myMotherLode.com Daily Newsletters by clicking here. Report breaking news, traffic or weather to our News Hotline (209) 532-6397. Send Mother Lode News Story photos to news@clarkebroadcasting.com.