Published Jun 28, 2026 12:51 pm : Updated Jun 26, 2026 1:13 pm
Soulsbyville Road culvert repair in Willow Springs
Motorists can expect delays on Mother Lode highways this week, June 28th to July 4th, 2026.
On Highway 4 intermittent one-way traffic control from Brice Station Road to Northwood Drive for drainage work beginning Monday and continuing through Wednesday from 7:00 a.m. until 4:00 p.m.
On Highway 4 traffic control at Little Johns Creek for bridge work is planned for Monday through Wednesday from 7:00 a.m. until 4:00 p.m.
On Highway 4 a long-term right shoulder closure from Gardener Lane Bridge to Depot Road for pavement will continue through Friday, July 17th.
On Highway 4 one-way traffic control from Lower Moran Road to Horseshoe Drive for survey work is scheduled for Wednesday from 8:00 a.m. until 3:00 p.m.
On Highway 26 traffic control at Stone Corral Creek for bridge work beginning Monday and continuing through Wednesday from 8:00 a.m. until 5:00 p.m.
On Highway 26 one-way traffic control at Stone Corral Creek for bridge work Monday through Wednesday from 8:00 a.m. until 5:00 p.m.
On Highway 26 one-way traffic control from White Road to Farris Lane for drainage work on Monday from 7:00 a.m. until 4:00 p.m.
On Highway 49 overnight, one-way traffic control from Sam’s Way to Copello Drive for excavation work beginning Sunday and continuing through Thursday from 9:00 p.m. until 7:00 a.m.
On Highway 49 one-way traffic control between Main Street and Gold Rush Lane in Moccasin for drainage work beginning Monday through Wednesday from 7:00 a.m. until 4:00 p.m.
On Highway 49 one-way traffic control between Main Street and Smoke Street in Jamestown for drainage work beginning Monday through Wednesday from 7:00 a.m. until 4:00 p.m.
On Highway 26 one-way traffic control from Main Street (Mokelumne Hill) to Gold Rush Lane for tree work beginning Tuesday through Wednesday from 8:00 a.m. until 5:00 p.m.
On Highway 108 overnight, one-way traffic control between Coffil Road and Long Barn Road for pavement work is planned for Sunday through Wednesday from 8:00 p.m. until 6:00 a.m.
On Highway 108 one-way traffic control from Old Strawberry Road to Lyons Dam Road for utility work is planned for Monday through Wednesday from 7:00 a.m. until 4:00 p.m.
On Highway 108 one-way traffic control between Crab Tree Road and West Cow Creek Road for drainage work on Monday from 7:00 a.m. until 5:00 p.m.
On Highway 120 one-way traffic control between Memorial Drive and the eastbound turnout lane for utility work beginning Monday through Wednesday from 7:00 a.m. until 4:00 p.m.
On Highway 120 one-way traffic control between Catholic Cemetery Street and Memorial Drive for drainage work beginning Tuesday through Wednesday from 7:00 a.m. until 4:00 p.m.
On Highway 120 one-way traffic control between Hardin Flat and the west boundary of Yosemite National Park for a crack seal operation beginning Monday through Wednesday, from 7:00 a.m. until 2:00 p.m.
Motorists should expect 5-10 minute delays and use alternate routes whenever possible. This work is scheduled as listed but is subject to change due to traffic incidents, weather, equipment availability, and/or construction-related issues. For the safety of workers and other motorists, please Be Work Zone Alert.
This post was last modified on 06/26/2026 1:13 pm
For Caltrans traffic information for Highway’s 4, 49, 59, 108, and 120 plus a view of traffic on other Mother Lode roads click on “Traffic” or keyword: traffic and our local gas price page is here. For an overview of extreme weather news stories go here.
Written by Sabrina Biehl.
Sign up for our Breaking News Alerts and the myMotherLode.com Daily Newsletters by clicking here. Report breaking news, traffic or weather to our News Hotline (209) 532-6397. Send Mother Lode News Story photos to news@clarkebroadcasting.com.