Cloudy
52.7 ° F
Full Weather
Sponsored By:

Post-Presidents Day Caltrans Roadwork Ahead

Sponsored by:

Stockton, CA – Caltrans crews have roadwork plans in store along four Mother Lode highways following the Presidents Day holiday on Monday.

In Calaveras County, Tuesday and Wednesday, along Highway 4, maintenance operations between Main Street in Douglas Flat and Pennsylvania Gulch may bring ten-minute delays from 9 a.m. until 3 p.m. On Wednesday, the work shifts to between Batten Road and Main Street, Douglas Flat.

Along Highway 12, Tuesday through Friday, ten-minute delays are likely as Caltrans crews work along the shoulder between Pine Street and Lime Creek Road from 8:30 a.m. until 5:30 p.m.

Highway 26 work Tuesday through Friday will generate ten to 15-minute delays while shoulder repairs are made between Nove Way and Double Springs Road from 8:30 a.m. and 5:30 p.m., and during drainage work between Happy Valley and Lower Dorray roads from 7:30 a.m. until 5 p.m.

In Tuolumne County, along Highway 108, Tuesday through Friday tree work scheduled between Confidence and Middle Camp Sugar Pine roads from 8 a.m. until 3 p.m. could cause brief traffic setbacks. On Thursday, utility work is scheduled between Via Estate/Rancho Poquitos and Mono Way from 10 a.m. until 3 p.m. along the right shoulder, which will also create momentary motorist delays. Friday, between 10 a.m. and 3 p.m. survey work is scheduled along the right shoulder that may cause similar interruptions from one mile east of the County Dump Road and the East Avenue under-crossing, located west of North Tuolumne Road.

Feedback