Clear
40.8 ° F
Full Weather | Burn Day
Sponsored By:

Caltrans Work Zone Plans For The Week Ahead

Sponsored by:

Stockton, CA—Next week, Caltrans plans to be out in force in several work zones along four highways.

In Calaveras County along Highway 4, Monday through Friday, a utility crew will be working along the shoulder between Manuel Road and the Arnold Byway between 7 a.m. and 5 p.m. Planned Tuesday through Friday more crack seal work between Beatrice Drive and Poison Springs Road from 8 a.m. until 3:30 p.m., with one-way traffic control and possible five-minute delays to motorists. On Friday, shoulder work between O’Bryne’s Ferry and Deer Creek roads from 8:45 a.m. until 3:15 p.m. will have one-way traffic controls in place and possible motorist delays of five minutes.

On Highway 49 in Calaveras County, tree work crews will be toiling between Monday and Thursday, south of Deer Creek Road and Toyanza Street from 8:45 a.m. and 3:30 p.m., with potential ten-minute delays under one-way traffic control.

In Tuolumne County along Highway 49 Wednesday and Thursday, scheduled crack seal operations between Wigwam Road and the Northbound 49 Bypass will set up from 8:30 a.m. until 3 p.m., with possible five-minute motorist delays.

Also along Highway 108 in Tuolumne County Monday and Tuesday, crack seal work is planned between the start of the passing lane east of Woods Creek Bridge to the end of the passing lane from 8:30 a.m. until 3 p.m., with possible five-minute motorist delays. Friday, crack seal work will run between Rancho Poquitos and Hidden Acres Road with possible five-minute delays.

In Tuolumne County along Highway 120, tree work scheduled each weekday will focus between the Tuolumne/Mariposa County Line and Cherry Valley Road from 9 a.m. until 3 p.m., with potential ten-minute delays under one-way traffic control.

Along Highway 120, Monday only, tree crews will work between Elder and White Gulch roads between 9 a.m. and 3 p.m,. with one-way traffic control and possible ten-minute delays. Tuesday, the tree work zone will be between Scofield and Catholic Cemetery streets from 9 a.m. and noon, with one-way traffic controls and ten-minute delays. Wednesday, tree crews will set up between Ferretti Road and Tenaya School from 9 a.m. until 3 p.m., with one-way traffic controls and ten-minute delays. Thursday, tree crews will work between Old State Route 120 and the Stanislaus North Forest Boundary from 9 a.m. until 3 p.m., with one-way traffic control and potential ten-minute delays.

Feedback